700-821 IOTSE Cisco IoT Essentials for System Engineers

Exam overview
This exam tests a candidate’s knowledge of Cisco’s Industrial Ethernet Switching, Cisco’s Industrial Ethernet Switching Management Options, Cisco’s Industrial Wireless, Cisco Remote and Mobile Assets Hardware, and Cisco Remote and Mobile Assets Software.

Exam topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. To better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Exam Description:
Cisco IoT Essentials for System Engineers v2.1 (IOTSE 700-821) is a 60-minute exam. This exam tests a candidate’s knowledge of Cisco Industrial Ethernet Switching, Cisco Industrial Wireless, Cisco Industrial Routing, and Cisco IoT Operations Dashboard. The course IoT Essentials Technical helps candidates to prepare for this exam.

The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. To better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Examkingdom Cisco 700-821 IOTSE Exam pdf,

MCTS Training, MCITP Trainnig

Best Cisco 700-821 IOTSE Free downloads , Cisco 700-821 IOTSE Dumps at

30% 1.0 Cisco Industrial Ethernet Switching
1.1 Describe the Industrial Switches Portfolio
1.2 Describe the capabilities of Industrial Switches
1.3 Explain the power supply options for Industrial Switch
1.4 Explain the management options for Industrial Switch

20% 2.0 Cisco Industrial Wireless
2.1 Describe the capabilities of IW6300
2.2 Describe the capabilities of IW9167
2.3 Describe Cisco Ultra-Reliable Wireless Backhaul Solution

25% 3.0 Cisco Industrial Routing
3.1 Describe the Industrial Routing and gateway portfolio
3.2 Explain the functionality of Industrial Routers and Gateways
3.3 Explain the SDWAN support on IR routers

25% 4.0 Cisco IoT Operations Dashboard
4.1 Describe the functionality and architecture of the IoT Operations Dashboard
4.2 Explain Edge Device Manager and how to deploy and manage routers and gateways with EDM
4.3 Describe the architecture of Secure Equipment Access

QUESTION 1
What information can be updated in the Master PM application for an associated Preventive Maintenance record (PM)?

A. Work Order Status
B. PM Forecast
C. Generate Work Orders
D. PM Hierarchy

Answer: B

The PM Forecast field on the Master PM record is used to specify how many days ahead you want to forecast work orders for associated PMs2. This field can be updated in the Master PM application and
affects how many work orders are generated from the associated PMs.

QUESTION 2
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved?

A. Choose Work Order on question action.
B. Make the question response interactive.
C. In Form Settings add an Action Script.
D. In the Question Options, set the Require action flag.
E. Create an escalation on the QRESPONSE Object.

Answer: AD

Explanation:
According to the IBM documentation, you can create inspection forms that detail the questions and types of responses that you want to collect. The inspection forms that you create are then available
to inspectors in the Conduct an Inspection tool. You can also add conditions to the response fields of existing questions on inspection forms to gather more information. You can determine which
additional response fields appear to inspectors, depending on the answers they gave to inspection form questions.
To create a work order based on certain responses, you need to do two things:
Choose Work Order on question action: This option allows you to specify an action that is triggered when a certain response is selected by the inspector. For example, if a question asks -Is there any
damage?-?, and the inspector selects -Yes-?, you can choose Work Order as the action that is triggered by this response. This will create a work order for repairing the damage.
In the Question Options, set the Require action flag: This option allows you to indicate that an action is required for a question. For example, if a question asks -Is there any damage?-?, and you set the
Require action flag to Yes, then the inspector must select a response that triggers an action, such as Work Order or Notification. If they select a response that does not trigger an action, such as -No-? or
-N/A-?, they will see an error message and will not be able to submit the inspection form.

QUESTION 3
In which three applications can Asset Depreciation be configured?

A. Chart of Accounts
B. Tools
C. Asset Templates
D. Locations
E. Assets
F. Item Master

Answer: CDE

Explanation:
Asset Depreciation can be configured in three applications in IBM Maximo Manage v8.0 according to
IBM’s documentation. These applications are:
Asset Templates
Assets
Locations

QUESTION 4

How is the Lock Out / Tag Outs application structured?

A. Specify a Lock Out on an Asset with a Locking Device and define the Tag Out Operations.
B. Specify a Lock Out on the Location or Asset and define the Tag Out Operations.
C. Specify a Tag Out on the Location or Asset and define the Lock Out Operations.
D. Define the isolation procedures on a set of related assets and specify a sequence.

Answer: B

Explanation:
In IBM Maximo Manage v8.0 implementation, the Lock Out / Tag Out application is structured such
that you specify a Lock Out on the Location or Asset and define the Tag Out operations. This
application is used to manage the procedures and controls put in place to protect personnel from
injury due to unintended or inadvertent equipment or system operation.

Click to rate this post!
[Total: 0 Average: 0]

About the author /


Archives

Latest

+

Random

+
May 2023
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031